“Construction” is a section of BusinessDaily.am’s “Regions in Numbers” reference: 1 table, 8 indicators for Ararat.

Period: January–August / end of August 2026.

For example:

  • Residential floor area commissioned — 38 595 m² (Q2 2026)
  • Residential floor area commissioned — 68 350 m² (January–June 2026)
  • Residential floor area commissioned — index on previous year — 149.5 %, base = 100 (Q2 2026 / same period of 2025)

Source: Statistical Committee of the Republic of Armenia.

Construction

No data for January–August 2026. Latest available data shown: Q2 2026; January–June 2026.

IndicatorPeriodUnitAraratRANoteSource
Residential floor area commissionedQ2 2026m²38 595403 0021PDF p. 2, column 2
Residential floor area commissionedJanuary–June 2026m²68 350685 8321PDF p. 2, column 5
Residential floor area commissioned — index on previous yearQ2 2026 / same period of 2025%, base = 100149.5145.81PDF p. 2, column 4
Residential floor area commissioned — index on previous yearJanuary–June 2026 / same period of 2025%, base = 100197.7147.11PDF p. 2, column 7
Construction volumeJanuary–June 2026million AMD14 902.2186 579.91PDF p. 9, column 2
Construction volume — index on previous yearJanuary–June 2026 / January–June 2025%, base = 100147.6125.81PDF p. 9, column 4
Construction and installation worksJanuary–June 2026million AMD14 664.3178 027.11PDF p. 9, column 5
Construction and installation works — index on previous yearJanuary–June 2026 / January–June 2025%, base = 100146.61281PDF p. 9, column 7
Notes (1)
  1. Latest available regional data from the half-year release.