Armenia could develop Yerevan’s metro and cable cars in stages funded by targeted bonds

The metro in Yerevan, Armenia’s capital, needs a phased development programme with a clear sequence, cost estimates and funding sources rather than a collection of separate promises. The metro should remain the backbone of rapid public transport, while cable cars can complement it where terrain and dense development make building the metro especially expensive.
What the overall metro project includes
Yerevan today has a single metro line with a branch to Charbakh: 10 stations in total and more than 12 km of track. The historical development scheme envisaged three lines and 32 stations, but this is a long-term planning concept, not a list of fully designed and funded construction projects. The 1983 scheme shows the planned development of the network, while the official description of the metro confirms the current size of the system.
Yerevan’s approved 2024–2028 development programme lists specific measures for the metro and cable transport. It separately covers station construction, preparation of design documentation and modernisation of the existing network.
Construction of Ajapnyak station. The programme envisages completing the station within the five-year period. It is to extend the metro network to the right bank of the Hrazdan gorge. The project includes complex structures to cross the gorge. Its current estimate is AMD 107.3 billion (about $287 million).
A station towards Malatia-Sebastia. The approved programme provides for completing the design of a station serving this administrative district in western Yerevan. This refers to preparing the design, not to completing construction of the station itself.
A new station near the Surmalu and Petak shopping centres. The programme includes building a station in this area. In 2026, Yerevan City Hall reported the completion of the tender for a feasibility study of a station next to Surmalu. This is a preparatory stage; the announcement did not give a final cost estimate or construction timeline.
A second entrance at Yeritasardakan station. The programme plans an additional entrance from the intersection of Abovyan and Sayat-Nova streets. It will improve access to the existing station but will not add a new station to the network.
Modernisation of the existing network. Plans include upgrading 16 cars, repairing and modernising the depot, signalling and communication systems, replacing cables and repairing other equipment. This work maintains the reliability of the metro and its existing infrastructure.
Ajapnyak-Jrvezhavan-Proshyan cable car. The approved programme includes developing a cable car network in this direction as an alternative transport link. It does not specify the cost or individual implementation stages.
Long-term development: new directions and lines. In September 2026, Armenian Prime Minister Nikol Pashinyan stated that the construction of at least four new stations is being considered. This is a political guideline, not an approved stage with routes, timelines, designs and financing.
The programme does not approve the construction of four new stations and does not set a sequence for further metro expansion beyond the measures listed. The design of a station towards Malatia-Sebastia and the feasibility study for a station at Surmalu should be distinguished from construction already under way.
The old 32-station scheme should serve as a reference for a future master plan, while the near-term programme should be built around specific projects: Ajapnyak, Surmalu, the further direction towards Malatia-Sebastia, and accessibility and modernisation of the existing network. Other sections require updated feasibility studies, passenger traffic forecasts and cost estimates.
Where cable cars make sense
A cable car can link districts separated by a gorge or steep slopes. It does not match the metro’s capacity and is not suitable for every route, but it can work as part of the wider transport network, with transfers to the metro and buses.
Nor Nork. In September 2025, City Hall announced a procurement of consulting services to prepare design and cost documentation for a new cable car from the central Kentron district to Nor Nork. This is not yet a construction tender or an approved cost.
Arabkir. A route from Tamanyan Park to Nor Arabkir Park was among the 2018 proposals. It was a route idea, not an approved project.
Zeytun and Kanaker. The same proposals included a route from Komitas Park to the Kanaker-Zeytun district. It would need to be re-examined for alignment, passenger traffic, safety and cost.
Ajapnyak-Jrvezhavan-Proshyan. Cable car routes in this direction have also been mentioned as part of the city’s transport development. Yerevan’s 2024–2028 development programme describes them as a planned direction, not a line with a ready cost estimate.
The old estimate of about $20 million for a 5–6 km route, published in 2018, is useful only as a historical order of magnitude. It is not a current cost estimate for Nor Nork, Arabkir or Zeytun: routes, stations, capacity, safety requirements and construction prices all differ.
How many stations a quarter of bank deposits could “cover”
According to the Statistical Committee of Armenia, deposits in Armenia’s commercial banks totalled about AMD 8.67 trillion at the end of September 2026, of which resident deposits were about AMD 7.00 trillion. If even a quarter of resident deposits, about AMD 1.75 trillion, were directed to building metro stations like Ajapnyak (AMD 107.3 billion, or about $287 million), 16 such stations could be built. This is only a comparison of amounts: deposits are not state funds, and Ajapnyak is a complex structure with a gorge crossing, so its cost cannot be treated as a typical price for a metro station. Cost estimates for other stations will depend on depth, geology, tunnels, interchanges and associated structures.
Bank deposits, of course, are not government money. The city or the state cannot simply direct them to the metro. Government targeted bonds could voluntarily attract part of private savings, but this would be a loan with interest and a maturity date. To attract funds sitting idle in banks, both from those who will ride the metro and cable cars and from those for whom these will ease Yerevan’s traffic jams, depositors need clear terms and transparent reporting on the cost, spending and progress of each stage.
International experience
Metro
Tbilisi, Georgia. The State University station, the 23rd in the network, opened in 2017. Work resumed in 2015 after a long pause. The project included the station and tunnel rehabilitation; its total cost was GEL 84 million, about $33.5 million at the 2017 average exchange rate.
Sofia, Bulgaria. The first stage of the third line, about 8 km with 8 stations, was estimated at BGN 935.5 million including VAT, or about $546 million at the 2020 average euro-dollar rate. This is the cost of the entire section, including tunnels, stations and equipment, not of individual stations.
Thessaloniki, Greece. The first line of the new metro, with 13 stations, opened in 2024. The total construction cost of the first line and the branch to the Kalamaria district reached about €3 billion, roughly $3.25 billion at the 2024 average rate. The project was delayed by court disputes, property issues, archaeological finds and funding problems.
Cable cars
Medellín, Colombia. Metrocable is integrated with the metro and bus network: cable lines connect hillside neighbourhoods with transfer hubs. The first line, Line K, about 2 km long, cost about $24 million at 2003 exchange rates.
La Paz-El Alto, Bolivia. A large network of urban cable cars connects districts at different altitudes. Yerevan can learn from how the cable lines are tied to other modes of transport; costs cannot be compared directly because projects and financing conditions differ.
Toulouse, France. The Téléo line, about 3 km long with three stations, connected a university, a hospital and a medical campus; the investment cost was estimated at €82.4 million, about $87 million at the 2022 average rate.
Bogotá, Colombia. TransMiCable connected an outlying district with the trunk transport network. It is an example of an additional link between a district and the main network, not a replacement for a metro.
How to turn the bond idea into a programme
Yerevan should announce preparations for state or municipal targeted transport bonds, but issue them only after a specific project portfolio is ready. It could include Ajapnyak, Surmalu station, design of the Malatia-Sebastia direction, modernisation of the existing network and feasibility studies for cable car routes to Nor Nork, Arabkir and Zeytun.
For each project, the cost estimate, work stages, passenger traffic estimate, transfer scheme and debt repayment source should be published. This way, bonds could voluntarily channel long-term savings into specific city projects rather than promise to fund the entire historical metro scheme at once.